[Scpg] MORE INFO Rebuilding of Kandal Village in Iraq with Permaculture Design and Strawbale Housing posted by Geoff Lawton with Photos

Wesley Roe and Marjorie Lakin Erickson lakinroe at silcom.com
Sun Nov 30 08:01:44 PST 2003


Rebuilding of Kandal Village in Iraq with Permaculture Design and Strawbale 
Housing posted by Geoff Lawton back to index
http://www.permaculture.org.au/article.php?articleid=5

www.photos.permaculture.org.au/index.php


Rebuilding of Kandal Village Iraq

Using

Permaculture Design

And

Strawbale Housing


Overall Project Goal

Resettlement of IDPs in Kandal Village in Makhmur District through training 
of building alternative houses (strawbale), rehabilatation of their water 
system, provide basic livelihood elements for income generation; and 
generally educating the community on sustainable design systems and income 
generation using the science of Permaculture (Permanence in Culture).

Project Summary

Counterpart International proposes to initiate the resettlement of 34 
families of internally displaced persons (IDPs), currently residing in 
temporary shelters in the village of Kandal Yarmija in Makhmur District, 
Erbil Governorate, Iraq. The project, IDP Return and Resettlement in 
Makhmur, will be accomplished through a three-pronged approach, one, the 
training of IDP laborers in the building of straw-bale housing structures 
and also on earth works that serves as water reservoir (small dams), two, 
the subsequent construction of straw-bale housing for IDP residents in this 
village; and three, provide basic training and techniques for income 
generation and community gardening. The project cost is 172,233$ in UNHCR 
support, however Counterpart International will pursue additional funds in 
order to continue and expand these activities, which promote sustainable, 
cost- and energy efficient housing for internally displaced persons in Iraq.

IDP Return and Resettlement in Makhmur will be implemented over an 8-week 
period, from July 17 – September 17, 2003. Based on the needs assessments 
conducted by Counterpart International Iraq in the village of Kandal 
Yarmija, discussions held with local government officials of the Makhmur 
District, and consultations with UNHCR, and experts in energy efficient 
housing design, Counterpart International has determined that there is an 
urgent need to provide permanent housing and a sustainable community 
services for internally displaced persons in Makhmur, in a manner that is 
cost efficient, energy efficient, sustainable, utilizes local resources, 
and is easy and quick to construct and establish.

Counterpart International has developed a comprehensive, three-phase 
strategy for the design, implementation, and evaluation of a high impact, 
emergency resettlement project, which will immediately respond to the 
housing needs of 34 families in Kandal Yarmija. This project will begin a 
process of local capacity building by addressing immediate needs for 
shelter and fostering community-led recovery as it promotes effective Iraqi 
implementation of straw-bale housing initiatives. Counterpart will provide 
full access to water, waste management and electricity and will incorporate 
all the elements and materials necessary into the housing design.

IDP Return and Resettlement in Makhmur is fully in support of UNHCR’s 
objectives to provide internally displaced persons with meaningful 
protection and a lasting solution to their plight .

Counterpart International will innovatively address three priority 
objectives is the design of the houses: one, to provide education and 
training for 34 IDP families in the village of Kandal Yarmija in the 
benefits of straw-bale housing versus traditional concrete “cinderblock 
housing” including cost efficiency (through local availability of 
construction materials and the use of community laborers), energy 
efficiency, aesthetic value, and ease of construction; two, rehabilitate 
and construct the communal water system for water distribution to the 
houses; and three, train the community and provide it with income 
generation activities and principles. Counterpart through this project will 
initially donate animals and seeds to plant. Animals will have three main 
benefits; food, feathers, liquid manure. The plants will have four 
sustainable functions: food, aesthetics, soil stability and noise reduction 
from highway.

Counterpart will ensure a safe water and sanitation system in put in place. 
The project will build each house a septic tank for toilets. The community 
will be provided and trained on natural biological system for managing 
their gray water (bathroom and kitchen waters). Several houses may stream 
their gray water through reed beds (a system wehre by plnats and shrubs 
filter the gray water and the secondary quality water can be used in the 
irrigation of orchards or flower gardens and such).

The activities will be undertaken in full coordination with UNHCR, the 
Ministry of Reconstruction and Development (including the local government 
of Makhmur District), and the Office of the Coalition Provisional Authority 
(OCPA) and CMOC in Iraq.

Problem Analysis

The village of Kandal Yarmija is located in the sub-district of Kandenawa, 
Makhmur District, Erbil Governorate. According to a report by the Ministry 
of Reconstruction and Development (MORAD), the Iraqi regime under Saddam 
Hussein began applying a policy of “Arabization” in the Makhmur District in 
the late 1960’s, forcibly displacing thousands of Kurdish families from 
their homes, many of whom fled to the City of Erbil. Since the collapse of 
the Hussein regime in April 2003, approximately 313 families have returned 
to their original homes in the Makhmur district, and many other former 
residents have indicated their willingness to return .

The village of Kandal Yarmija, located 5 km. from the City of Makhmur, 
suffered a series of forced “Arabization” programs in 1963, 1975, and 1985, 
resulting in the nearly complete displacement of 85 Kurdish families. Based 
on research conducted by MORAD, approximately 45 families have returned to 
the village; this figure consists of 34 families who have permanently 
resettled in the area and 41 families who do not have shelter, leaving 
squatters’ camps every evening for the City of Makhmur and retuning the 
next day. The village encompasses approximately 110,000 donems (or 27,500 
hectares) of agricultural land, and relies on the harvest of wheat and 
barley for the livelihood of its inhabitants .

Internally displaced persons in the Makhmur District and throughout 
northern Iraq are confronting a variety of challenges including: a lack of 
available employment, scarcity of natural resources such as land and water, 
and insufficient (or non-existent) water and sanitation systems. In 
addition to the threats to IDPs’ physical welfare and income, these groups 
must also confront a variety of challenges to the well being of the family 
and larger community. Displacement often results in a severe disruption of 
the community’s social network, and consequently, a negative impact on 
traditional, community-oriented coping mechanisms. In particular, current 
overcrowding in public buildings and abandoned military posts (as a 
temporary means of shelter) is forcing entire families to eat, sleep, and 
conduct all domestic activities in one small room resulting in an increased 
rate of social (lack of privacy/intimacy) and health (infectious diseases) 
problems.

Project Objectives

1. Sustainable rehabilitation and development of Kandal village in Makhmur.

2. Demonstrate a mini Permaculture site at the village.

3. Train the community on strawbale housing method other than cinder blocks 
and mud bricks.

4. Train the community on water catchments methods in the landscape

5. Establish a communal water distribution system

6. Establish a waste water management system by using reed beds.

7. Individuals from 34 families are trained on strawbale housing skills.

8. Train the community on production of organic food which leads to income 
generation and community garden management.

Inputs

1. Personnel (Consultant on Strawbale construction, Project Manger, 
Engineer, Field Monitor)

2. Provision of livelihood elements such as animals and plants for 
environmental protection, income generation and community stabilization

3. Materials and Equipment for completion and maintenance of site 
infrastructure including WastSan.

4. Materials for training programs and onsite income generation activities

5. Transportation.

6. The IDP Laborers who will build the houses themselves at no cost.

7. Electrical Technician, Blacksmith and Plumber.

Outputs

By the end of the project:

1. Kandal village is rehabilitated in line with a mini Permaculture design 
plan.

2. At least 30 people provided with training in basic concepts of Permaculture.

3. The local community trained on strawbale housing to build for future 
family expansion.

4. Basic income generation concepts and practices taught and practiced

5. Basic water catchment pools and wells constructed and village communal 
water system established.

6. The waste management system established and fully functional for the 
village residents.

7. Basic livelihood stock provided (plants and animals) to 34 families

Project Beneficiaries

The project aims to benefit:

1. All residents of Kandal village (34 families) through safe shelters, 
knowledge and skills acquired during the training.

2. All staff and laborers involved.

3. Low-income families who are able to take advantage of the project 
activities and outlets.

4. The IDP men and women trained on strawbale housing and water catchments 
strategies and income generation activities.

5. Site visitors who are expected to pass through (Government officials, 
Donors, NGOs..etc) the site over the life of the project or those potential 
partners who are interested in further investing in the community. These 
would include local, national and international.

Straw bale building manel for Kandal Village project Iraq posted by Geoff 
and Nadia Lawton back to index
<images/shim.gif>


Strawbale Building

Manuel for Kandal Village

IRAQ

Kandal Village Goals of Resettlement

Resettlement of IDPs in Kandal Village in Makhmur District through training 
of building alternative houses (strawbale), rehabilitation of their water 
system, provide basic livelihood elements for income generation; and 
generally educating the community on sustainable design systems and income 
generation using the science of Permaculture (Permanence in Culture).

Project Summary

Counterpart International proposes to initiate the resettlement of 52 
families of internally displaced persons (IDPs), currently residing in 
temporary shelters in the village of Kandal Yarmija in Makhmur District, 
Erbil Governorate, Iraq. The project, IDP Return and Resettlement in 
Makhmur, will be accomplished through a three-pronged approach, one, the 
training of IDP laborers in the building of straw-bale housing structures 
and also on earth works that serves as water reservoir (small dams), two, 
the subsequent construction of straw-bale housing for IDP residents in this 
village; and three, provide basic training and techniques for income 
generation and community gardening. The project cost is 172,233$ in UNHCR 
support, however Counterpart International will pursue additional funds in 
order to continue and expand these activities, which promote sustainable, 
cost- and energy efficient housing for internally displaced persons in Iraq 
IDP Return and Resettlement in Makhmur will be implemented over an 8-week 
period, from July 17 - September 17, 2003. Based on the needs assessments 
conducted by Counterpart International Iraq in the village of Kandal 
Yarmija, discussions held with local government officials of the Makhmur 
District, and consultations with UNHCR, and experts in energy efficient 
housing design, Counterpart International has determined that there is an 
urgent need to provide permanent housing and a sustainable community 
services for internally displaced persons

in Makhmur, in a manner that is cost efficient, energy efficient, 
sustainable, utilizes local resources, and is easy and quick to construct 
and establish.

Counterpart International has developed a comprehensive, three-phase 
strategy for the design, implementation, and evaluation of a high impact, 
emergency resettlement project, which will immediately respond to the 
housing needs of 34 families in Kandal Yarmija. This project will begin a 
process of local capacity building by addressing immediate needs for 
shelter and fostering community-led recovery as it promotes effective Iraqi 
implementation of straw-bale housing initiatives. Counterpart will provide 
full access to water, waste management and electricity and will incorporate 
all the elements and materials necessary into the housing design. IDP 
Return and Resettlement in Makhmur is fully in support of UNHCR's 
objectives to provide internally displaced persons with meaningful

protection and a lasting solution to their plight .

Counterpart International will innovatively address three priority 
objectives is the design of the houses: one, to provide education and 
training for 52 IDP families in the village of Kandal Yarmija in the 
benefits of straw-bale housing versus traditional concrete "cinderblock 
housing" including cost efficiency (through local availability of 
construction materials and the use of community laborers), energy 
efficiency, aesthetic value, and ease of construction; two, rehabilitate 
and construct the communal water system for water distribution to the 
houses; and three, train the community and provide

it with income generation activities and principles. Counterpart through 
this project will initially donate animals and seeds to plant. Animals will 
have three main benefits; food, feathers, liquid manure. The plants will 
have four sustainable functions: food, aesthetics, soil stability and noise 
reduction from highway. Counterpart will ensure a safe water and sanitation 
system in put in place. The project will build each house a septic tank for 
toilets. The community will be provided and trained on natural biological 
system for managing their gray water (bathroom and kitchen waters). Several 
houses may stream their gray water through reed beds (a system where by 
plants and shrubs filter the gray water and the secondary treated quality 
water can be used in the irrigation of orchards or flower

gardens and such).



The activities will be undertaken in full coordination with UNHCR, the 
Ministry of Reconstruction and Development (including the local government 
of Makhmur District), and the Office of the Coalition Provisional Authority 
(OCPA) and CMOC in Iraq.

Problem Analysis

The village of Kandal Yarmija is located in the sub-district of Kandenawa, 
Makhmur District, Erbil Governorate. According to a report by the Ministry 
of Reconstruction and Development (MORAD), the Iraqi regime under Saddam 
Hussein began applying a policy of "Arabization" in the Makhmur District in 
the late 1960's, forcibly displacing thousands of Kurdish families from 
their homes, many of whom fled to the City of Erbil. Since the collapse of 
the Hussein regime in April 2003, approximately 313 families have returned 
to their original homes in the Makhmur district, and many other former 
residents have indicated their willingness to return .The village of Kandal 
Yarmija, located 5 km. from the City of Makhmur, suffered a series of 
forced "Arabization" programs in 1963, 1975, and 1985, resulting in the 
nearly complete displacement of 85 Kurdish families. Based on research 
conducted by MORAD, approximately 45

families have returned to the village; this figure consists of 34 families 
who have permanently resettled in the area and 41 families who do not have 
shelter, leaving squatters' camps every evening for the City of Makhmur and 
retuning the next day. The village encompasses approximately 110,000 donems 
(or 27,500 hectares) of agricultural land, and relies on the harvest of 
wheat and barley for the livelihood of its inhabitants .

Internally displaced persons in the Makhmur District and throughout 
northern Iraq are confronting a variety of challenges including: a lack of 
available employment, scarcity of natural resources such as land and water, 
and insufficient (or non-existent) water and sanitation systems. In 
addition to the threats to IDPs' physical welfare and income, these groups 
must also confront a variety of challenges to the well being of the family 
and larger community. Displacement often results in a severe disruption of 
the community's social network, and consequently, a negative impact on 
traditional, community-oriented coping mechanisms. In particular, current 
overcrowding in public buildings

and abandoned military posts (as a temporary means of shelter) is forcing 
entire families to eat, sleep, and conduct all domestic activities in one 
small room resulting in an increased rate of social (lack of 
privacy/intimacy) and health(infectious diseases) problems.

Project Objectives

1. Sustainable rehabilitation and development of Kandal village in Makhmur.

2. Demonstrate a mini Permaculture site at the village.

3. Train the community on strawbale housing method other than cinder blocks 
and mud bricks.

4. Train the community on water catchments methods in the landscape

5. Establish a communal water distribution system

6. Establish a waste water management system by using reed beds.

7. Individuals from 52 families are trained on strawbale housing skills.

8. Train the community on production of organic food which leads to income 
generation and community garden management.

Inputs

1. Personnel (Consultant on Strawbale construction, Project Manger, 
Engineer, Field Monitor)

2. Provision of livelihood elements such as animals and plants for 
environmental protection, income generation and community stabilization

3. Materials and Equipment for completion and maintenance of site 
infrastructure including Waste San.

4. Materials for training programs and onsite income generation activities

5. Transportation.

6. The IDP Laborers who will build the houses themselves at no cost.

7. Electrical Technician, Blacksmith and Plumber.

Outputs

By the end of the project:

1. Kandal village is rehabilitated in line with a mini Permaculture design 
plan.

2. At least 30 people provided with training in basic concepts of Permaculture.

3. The local community trained on strawbale housing to build for future 
family expansion.

4. Basic income generation concepts and practices taught and practiced

5. Basic water catchment pools and wells constructed and village communal 
water system established.

6. The waste management system established and fully functional for the 
village residents.

7. Basic livelihood stock provided (plants and animals) to 52 families

Project Beneficiaries

The project aims to benefit:

1. All residents of Kandal village (52 families) through safe shelters, 
knowledge and skills acquired during the training.

2. All staff and laborers involved.

3. Low-income families who are able to take advantage of the project 
activities and outlets.

4. The IDP men and women trained on strawbale housing and water catchments 
strategies and income generation activities.

5. Site visitors who are expected to pass through (Government officials, 
Donors, NGOs..etc) the site over the life of the project or those potential 
partners who are interested in further investing in the

community. These would include local, national and international.



Strawbale Building Techniques 
http://www.permaculture.org.au/article.php?articleid=10


and

Permaculture Design Systems

Used at Kandal Village

The basic concept of the house design chosen takes advantage of the most 
readily available, affordable materials and culturally acceptable to the 
local culture. This consisted of a concrete floor, load bearing steel 
poles, steel beams connecting the bearing steel poles, straw bales, timber 
pole supports in the roof, mud render, cement plaster, gypsum plaster. This 
technique is called in-fill or non-load bearing bale, for it depends on a 
pole or post and beam building design. Post and beam construction employs a 
skeleton of vertical posts and horizontal beams to support the roof. The 
straw bale walls have only themselves to support. The bales are attached to 
each other by piercing the bales with rebar or bamboo and attaching the 
bales to the poles or columns.

First Step: after designing the site, we start leveling the area for each 
house.


Second Step: digging the foundation holes for steel poles that bear the 
weight of the roof

in all corners and the middle of the house

Third Step: concreting the foundation and erecting the steel poles propped 
in a vertical

position and concreted in.

Fourth Step: the houses plumbing pipes can be positioned before concreting 
the floor, and positioning reinforcing bars that protrude vertically out of 
the concrete 75cm. at 80cm. spacing directly under where the straw bale 
walls will be built.

Fifth Step: Welding the steel I-beams on the top of each steel pole, making 
a strong box frame work to support the roof.

Sixth Step: Door frames need to be positioned and anchored on to the 
concrete floor.

Seventh Step: the impaling of the first course of straw bales on to the 
steel bars

Notice: smaller size straw bales are made using large steel needles made 
from steel reinforcing bars and are used to pierce the straw bale and 
stitch the appropriate sized bales, which has the effect of retaining the 
compaction of the straw bale.



Eighth Step: laying the straw bales in a brick wall type pattern 
criss-crossing way like giant blocks, and stiffening the bales with 1 meter 
steel bars, as the walls get higher.


Ninth Step: Window frames are positioned usually at (30cm) variations of 
height, as this is the height of the average straw bale. The window frames 
are tied in to the surrounding straw bales with a wire.

Tenth Step: before starting the process of rendering the electrical wiring 
for the house can be positioned and pinned onto the straw bale walls using 
small steel U-shaped pins, the straw bale walls should be hosed with water 
until they soaked to a depth of 50mm. which allows the mud render to key 
into the straw. The base coat of render is a mixture of three buckets of 
soil (30% to 50% clay content), with two buckets of sharp sand, one bucket 
of straw and one bucket of water adjusted to become a sticky consistency. 
This mixture is smeared on to the wet straw bale wall, making sure that has 
good penetration. If the mixture doesn’t stick easily on to the wall, then 
the soil content needs to be increased and sand content decreased, but if 
the mixture cracks badly upon drying, the sand and straw content needs to 
be increased.


Eleventh Step: When the first layer render is completely dry, and you are 
satisfied with the result, the wall can be hosed with water again. The next 
process of rendering consists of sieving the soil and replacing the straw 
with chaff, which adjusted to make a sticky mixture then you start rending 
the wall and this coat can be applied with a metal trowel for a smoother 
finish.

Twelfth Step: when the mud and chaff render is dry chicken wire is pinned 
to the surface of the wall both inside and outside using U-shaped pegs made 
up with thin steel bar.

Thirteenth Step: a cement render is made up using 3 sand 1 cement and ½ a 
lime and 1 water this mix is plastered onto the outside walls and the 
inside of the bathroom and along the bottom of all the internal walls just 
25cm up from the floor using a metal trowel. The walls are allowed to dry 
then hosed with water and a second coat applied where needed this is then 
allowed to dry. Once dry the walls should be hosed with water twice a day 
to slow the final drying process to reduce the possibility of cracking.

Fourteenth Step: a mix of gypsum and water is made up to a plaster 
consistency and

using a metal trowel is plastered onto the inside walls.

Fifteenth Step: the roof can be constructed at and stage after the Fifth 
Step and can be constructed in numerous ways. At Kandal Village we used 
wooden round poles as roof rafters over which steel mesh as used in 
re-enforcing concrete floors was placed then date palm matting and on top 
of this 50mm. of soil was placed and on top of this a steel re-enforced 
concrete slab was poured. This forms a earth sandwich with water proof 
concrete seal with a 2% slope to run off rain water.

Sixteenth Step: interior and exterior of the house can be painted in the 
colours that may be desired by the owners and the bathroom walls and the 
25cm. of cement rendered bottom section of all the interior walls can be 
tiled if desired.

Seventeenth Step: the doors internal and external can be fitted also the 
glass windows can be fitted.

Eighteenth Step: the house is now ready for the plumbing fittings to be 
finished, the electricity connected and the final fittings put in place.

The Main Water Supply: the village water supply is from a bore well drilled 
on a hill to a depth of approximately 120m.and pumped up to the large 
concrete water tank under construction in the photo below. From this tank 
the water is gravity fed to 1000 liter metal water tanks in the photo 
above, these 1000 liter metal tanks are positioned on top of each house 
allowing for direct gravity fall into the bathrooms, kitchens and toilets.

The area allocated for building was decided by the local village community, 
which the area is approximately 2 hectares. The site boundaries were 
surveyed and 52 houses and a community centre were positioned in such a way 
as to take maximum benefits of the solar aspect to the South and East, in 
addition to the shading of the hot afternoon sun in the summer from the west.

The position of the houses allows for a multi functional road design 
allowing for the run off of rain water to productive garden systems, 
leaving 3 areas of approximately 0.5 hectare each for intensive food 
production, in the most appropriate position for this purpose and directing 
nutrient flows by gravity from bio-logical cleaning systems. All grey water 
from the kitchens and bathrooms has been design to be directed to 5 
strategically placed bio-logical reed bed cleaning systems 3 soaking to 1 
main garden 2 soaking to 2 smaller garden systems. The cleaned out fall 
water is directed to contour soakage swales planted to fruit trees and 
below these mixed crop gardens with contour footpaths which can be flooded 
to soak the growing beds.

The main garden sited on the north side of the village has 3 reed beds and 
the road run off catchments directed into the main swale. There is also a 
duck and goose fenced pond constructed up hill from the main growing area 
on the east side, this enables the garden to fertilize with liquid manure 
by a gravity fall system.


The main water harvesting swales should be initially seeded to a legume 
cover crop and cover with a thin mulch of straw to force germination with 
minimum moisture requirement. Then fast growing legume trees planted on the 
up hill side these serve the system by initial shelter from wind and by 
shade greatly reducing evaporation. These trees also fix nitrogen to the 
soil while greatly enhancing the surrounding soil structure particularly 
down slope. They also produce large amounts of nitrogen rich mulch which 
can be cut and placed as mulch around the fruit trees, this greatly reduces 
soil moisture evaporation and as decomposition takes place contribute to 
the fertilizing of the fruit trees also increasing soil organic matter, 
improving soil structure. The legume trees should be prune for mulch at the 
end of summer just prior to the autumn rains as temperatures drop and 
evaporation has decreased and the system generally benefits from increased 
light. After cutting these trees quickly re-sprout new twig growth and by 
the beginning of the next summer when temperatures rise again and 
evaporation of soil moisture is a major problem they are performing their 
function of shade and wind protection. This process can be repeated year 
after year as the system establishes, eventually after a few years the wood 
from the larger prunings can be used for firewood for cooking or heating.

To assist sustainable agricultural production a large rock gabion was built 
across the wadi bordering the village, this will slow up the large 
assurances of rainfall runoff events that happen 2 or 3 times each winter. 
This water is normally carrying large quantities of soils in the form of 
sands, silts and rocks, when slowed all this material settles out above the 
rock gabion wall forming a large area of deep wet soil. The moisture in 
this silt field is retain well into the early summer months allowing for 
crops to planted with out the need for irrigation and production extended 
well into summer. The residual moisture surrounding the large volume of 
accumulated damp soil can be usefully utilized by the planting of a mixed 
food forest of diverse fruit trees and mixed fruit trees for support of the 
fruit trees with initial shade, wind breaking, nitrogen fixation and 
structuring of the soil also in the longer term as mulch producers and 
eventually fire wood producers.

There is potential on this site to generate income by using the site as a 
demonstration site education center for sustainable developments and in the 
process improve the facilities and infrastructure already in position. The 
community center can be used as a classroom for 2 week permaculture design 
certificate courses with students accommodated with the local people in 
some of the strawbale houses. They can be fed as much as possible from the 
gardens and orchards installed creating a direct outlet for village produce 
at the same time stimulating the need to extend the diverse organic growing 
systems.

Research into the energy auditing of the difference in the efficiency 
between the straw bale and non straw bale houses on the site could be 
performed by students. Establishment of composting toilet examples, solar 
hot water, solar electricity, solar food driers, solar glass house 
attachments and methane digesters are all possible and useful to the local 
environment for energy and water saving.

The designing of extended water harvesting earthworks to take in the larger 
community land could all be part of this process.

The end result of this development would be the production of teachers and 
designers of sustainable developments that extend these systems to other 
communities.







More information about the Southern-California-Permaculture mailing list